Close Menu
Philstar Tech
    • Deals
    • Contact Us
    • About Us
    Philstar Tech
    • Home
    • All Post
    • News
      • Features
    • Tech @Life
    • Reviews
      • Fitness
      • Laptops
      • Mobility
      • Smartphones
      • Wearables
    • Opinion
    Philstar Tech
    Home » Villa Escudero welcomes another renewable energy facility to lower operational costs
    Features

    Villa Escudero welcomes another renewable energy facility to lower operational costs

    Dawn SolanoBy Dawn SolanoNovember 18, 20243 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Villa Escudero installs a solar facility within its 800-hectare estate. Photo contributed by Villa Escudero.
    Share
    Facebook Twitter LinkedIn Pinterest Email

    The Villa Escudero Plantations and Resort has tapped into the power of solar energy, launching a solar facility within its estate to further reduce its carbon emissions and lower daily operational expenses.

    This 144-year-old estate in Tiaong, Quezon welcomed its second renewable energy facility with a switch-on event last November 7, 2024. 

    “We have no doubt about the technology. We’ve been operating a renewable energy power plant privately at the Escudero family since 1937, and well, bawing-bawi na kami,” Villa Escudero director Daniel Escudero told the media during the launch.

    The estate is also home to the Arsenio Escudero Hydroelectric Power Plant, the country’s first hydroelectric plant, which began its first venture into renewable energy.

    Moreover, Villa Escudero partnered with Cebu- based renewable energy company Vivant Energy, which used Canadian Solar for the energy management system for this solar facility.

    “The facility is grid type, meaning Villa Escudero would still get power from the grid at the same time when the solar facility is producing during the daytime,” said Mark Habana, the vice president of Vivant Energy.

    Habana explained that they did not apply a battery system yet because the size of the facility is about 211 kilowatt peak only. Thus, the amount produced by the facility during daytime should be consumed during those hours as well.

    The facility is said to displace 166 metric tons of carbon emissions, which is equivalent to planting 8,000 trees a year.

    Going green and greener

    The Villa Escudero director also revealed that they have plans to get green certifications for the estate’s sustainability efforts.

    “We want to emphasize that even resorts here in the Philippines, such as Villa Escudero, are trying to keep abreast and updated with the sustainability initiatives that we often see in higher end resorts in more developed, first world countries,” Escudero said. 

    When asked whether this initiative will eventually lower the cost of visiting the resort, the director said “hopefully” it will.

    The Escudero family believes that they will be able to reduce their operational expenses and mitigate effects of inflation with what they are able to save from the power generated by the solar facility.

    “…We will be able to retain an even lower price in the future as long as we have facilities such as this,” He said.

    The estate began as a plantation for sugarcane, and then for coconut. It was only in 1981 when the family opened it to the public as a sustainable tourist destination for Filipinos and foreign visitors alike. 

    Daniel Escudero philippines renewable energy Solar energy Solar facility Tiaong Villa Escudero Vivant Corporation Vivant energy
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Dawn Solano

    Content Producer for PhilSTAR Tech

    Related Posts

    Why connectivity is no longer a luxury—it’s the new face of bayanihan

    January 9, 2026

    Samsung’s open ecosystem makes AI belong in your life

    January 8, 2026

    realme returns under Oppo in BBK brand consolidation

    January 8, 2026

    Most Popular

    Stephen Cheng’s winning playbook

    December 22, 20253 Mins Read

    NVIDIA unveils better upscaling and frame generation with DLSS 4.5

    January 7, 20263 Mins Read

    realme returns under Oppo in BBK brand consolidation

    January 8, 20261 Min Read

    The top 10 coolest new tech we spotted at Samsung’s The First Look @ CES 2026

    January 5, 20263 Mins Read

    Here’s where you can officially buy the Nintendo Switch 2 in the Philippines (with 2 years warranty perks to match)

    July 8, 20253 Mins Read

    Samsung’s open ecosystem makes AI belong in your life

    January 8, 20265 Mins Read

    Latest

    HONOR X9d review: beyond the durability hype, a new standard in “midrange” capability

    By Jayvee FernandezJanuary 9, 20265 Mins Read

    Let the digital bulls run: How tech can finally wake up our capital markets

    By Henry Rhoel AgudaJanuary 9, 20263 Mins Read

    Why connectivity is no longer a luxury—it’s the new face of bayanihan

    By Henry Rhoel AgudaJanuary 9, 20263 Mins Read

    Samsung’s open ecosystem makes AI belong in your life

    By Vianca GamboaJanuary 8, 20265 Mins Read

    realme returns under Oppo in BBK brand consolidation

    By Dawn SolanoJanuary 8, 20261 Min Read

    NVIDIA unveils better upscaling and frame generation with DLSS 4.5

    By Jianzen DeananeasJanuary 7, 20263 Mins Read
    Copyright © 2026 Philstar Tech | Powered by The Philippine STAR

    Type above and press Enter to search. Press Esc to cancel.